Legoland
County Gutters were contracted to install a new aluminium rainwater system to the newly refurbished theme buildings within the park. Samples were supplied free of charge to gain approval, the products chosen was from the ARP range of rainwater goods, these include the Sentinel and Legion gutter system with the Colonnade range of rainwater pipes.
After a full site survey, the RAL colours then had to be matched to each individual building to comply with the Legoland colour themes. Aluminium was the most suitable material for this build as it is strong, non-corrosive and made from recycled aluminium, it can be powder coated to any colour required and helps enhance the architectural elements of the building, it will also give 30 years plus of functional life expectancy with little maintenance.
The whole installation took less than 2 weeks and had to be completed in time for the opening of the park after the current lockdown restrictions.
Location
- Windsor, Berkshire
Products
- Sentinel and Legion gutter system
- Colonnade range of rainwater pipes
Related Services
Legoland aluminium rainwater system installation
County Gutters were selected to install a new aluminium rainwater system for the recently refurbished theme buildings at Legoland. The project required attention to detail, including providing free samples for approval to ensure the highest quality standards. The selected products came from the ARP range, specifically the Sentinel and Legion gutter systems, paired with the Colonnade range of rainwater pipes, which met both aesthetic and functional requirements.
A full site survey was conducted to match the RAL colours to each individual building, adhering to Legoland's specific colour themes. Aluminium was chosen as the ideal material for the installation due to its strength, non-corrosive nature, and sustainable qualities. Made from recycled aluminium, it was powder-coated to match the theme park's vibrant colours while offering long-lasting durability. The system provides over 30 years of life expectancy with minimal maintenance. Despite the tight timeline, the entire installation was completed in less than two weeks, ensuring the park was ready for reopening after lockdown restrictions were lifted.